
Projects
A new bathroom upstairs, a new toilet downstairs
A space that originally had no bathroom was completely transformed to accommodate a brand-new bathroom on the second floor β built from scratch, from the structure and infrastructure to the final finishes. The project also included the creation of a new toilet on the ground floor.
Town
Amsterdam
Work carried out
- Complete creation of a new bathroom
- Construction of new walls
- Installation of a new door
- New ceiling
- Complete plumbing installation
- New electrical installation
- Underfloor heating
- Waterproofing
- Shower installation and preparation
- Bathroom furniture installation
- Sanitary ware and fittings
- Complete finishing
- Creation of a new toilet on the ground floor
- Adaptation of plumbing and electrical infrastructure
The situation
The property originally did not have a bathroom in this location. The space was part of the residential area and needed to be completely transformed to accommodate a new bathroom. At the same time, the clients wanted to remove the existing bathroom on the ground floor, allowing the living room and kitchen area to be expanded and better integrated.
The brief
The clients' main goal was to create a full bathroom on the second floor, making the layout of the house more practical and functional for everyday use.
The approach
Creating the new bathroom required building almost the entire space from scratch. The project included constructing new walls, installing a new door and ceiling, and carrying out all the plumbing and electrical infrastructure required for the new bathroom. Underfloor heating was also installed to provide additional comfort, while the entire space was properly prepared for the bathroom finishes and installations. As part of the overall reconfiguration of the house, a new toilet was also created on the ground floor. This replaced the function of the previous bathroom and allowed the former bathroom area to be incorporated into the living room and kitchen.
Before and after
The second-floor space before the bathroom was builtBeforeAfterDuring the work
Photo 1 / 5
The result
Photo 1 / 4
The result
The result was a complete transformation of the home's layout.
A space that previously had no bathroom infrastructure at all was transformed into a modern and fully functional bathroom on the second floor, while the new ground-floor toilet allowed an important part of the house to be opened up.
More than simply creating a new bathroom, the project was designed to improve the functionality, use of space, and overall living experience of the property, creating a solution tailored specifically to the clients' needs.

Contact
Ready for a completely
renewed bathroom?
Schedule a consultation with no obligation. We look at the room, discuss what you want and map out the project clearly.
Schedule a consultation












